Flood Field Backstop Renovation
Continuing Our Investment in Flood Field
Flood Field was successfully renovated in partnership with the local council in 2023, significantly improving the playing surface and overall usability of the site.
The proposed backstop upgrade represents the next stage of infrastructure development building on that investment to improve safety, durability, and long-term sustainability.
Why This Upgrade Is Needed
Structural supports currently encroach on the edge of the field, which is also used as a pedestrian footpath
These supports present a potential health and safety risk to pedestrians, particularly during evening games and in low light conditions
The existing structure requires annual repairs, including replacement plywood and sections of chainlink fencing
Limited foul ball containment results in ongoing equipment replacement costs
Continued patch repairs are not a sustainable long-term solution
This upgrade allows us to move from reactive maintenance to proactive infrastructure improvement.
What The Upgrade Will Deliver
Removal of the current backstop structure
Repositioning to improve clearance from pedestrian areas
Installation of high-durability panels and reinforced framing
Enhanced foul ball containment
Reduced ongoing maintenance requirements
A professional and resilient long-term solution
Why It Matters
The 2023 field renovation demonstrated what can be achieved through partnership and forward planning.
This backstop upgrade highlights our continued commitment to:
Public safety
Responsible stewardship of council-supported facilities
Financial sustainability
Raising standards across all levels of the club
Next Steps
Final design and technical specification
Supplier confirmation
Budget publication
Installation scheduling
Further detailed project documentation will be shared in due course.
Support This Project
If you would like to contribute toward the continued development of Flood Field, please use the Donate button here.
